PRICING SOFTWARE FOR HVAC CONTRACTORS

Quote installs and replacements with your equipment margin protected.

Equipment costs move. Pricing Calculator Pro prices the unit, ductwork, and line set alongside your labor, any subcontracted hookups, and overhead — then shows the price that holds your target margin.
BUILD MY FREE QUOTE SEE AN EXAMPLE QUOTE
Free for 14 days · No credit card required

How the Calculator Prices Your Jobs

An HVAC quote is built from the same five numbers every time. Here’s how each one factors into the price.

Materials

Price the furnace or condenser, ductwork, line sets, refrigerant, and thermostat as their own equipment line, separate from labor.

Labor

Enter install and removal hours at your technician rate to capture the true labor cost of a swap-out or new installation.

Subcontractors

Roll in electrical hookups, crane or rigging for rooftop units, or any other specialty work you sub out on the job.

Overhead

Account for permits, old-equipment disposal, and vehicle or fuel costs so overhead is covered before the quote goes out.

Target Profit Margin

Set the margin you need on equipment-heavy HVAC jobs and the calculator solves for the price that protects it, even when equipment costs shift.

Example Quote

A full system replacement — new condenser and furnace — with a subcontracted electrical hookup and standard overhead.

EXAMPLE QUOTE

Full System Replacement — 3-Ton AC & Furnace

Equipment & materials (3-ton AC + furnace, ductwork, line set, thermostat): $4,800.00
Labor (16 hrs × $85/hr): $1,360.00
Subcontractors (electrical hookup): $450.00
Overhead (permit + old unit disposal): $190.00
Profit: $2,644.44
Cost ItemAmount
Equipment & materials (3-ton AC + furnace, ductwork, line set, thermostat)$4,800.00
Labor (16 hrs × $85/hr)$1,360.00
Subcontractors (electrical hookup)$450.00
Overhead (permit + old unit disposal)$190.00
Total Job Cost$6,800.00
Target Profit Margin28%
Selling Price$9,444.44
Built-In Profit$2,644.44

How the selling price is calculated: Selling Price = Total Costs ÷ (1 − Profit Margin). Here, $6,800.00 ÷ (1 − 28%) = $9,444.44, which builds in $2,644.44 of profit at the target 28% margin.

Stop guessing what to charge on equipment-heavy jobs.

BUILD MY FREE QUOTE No cost. No credit card required.